Loyal employee with solid understanding of training and mentoring employees. Dedicated team player, proactive and hands-on in task completion.
Hard-working site manager with strong organisational skills. Achieves company goals through planning and prioritisation.
Over 22 years in underground utilities industry. Reputation for resolving problems and improving customer satisfaction. Offers flexible schedule to deliver on team goals.
Management of utilities projects (new installations and maintenance-repairs) through the Commonwealth of the Bahamas (water mains, sewer mains, sewer pumping stations, electrical and telecommunication conduits, drainage systems.
Duties included:
-materials estimates and procurement
-equipment requirements
-staffing requirements
-logistics
- inspection, testing and commissioning
Site manager for underground installations (watermains) in 3 different islands of the Bahamas; responsible for materials and equipment procurement, site and staff management; quality control, inspection and testing, commissioning
Prepare Autocad drawings for new branches and facilities for windows, door, furniture, floors and ceilings, to be issued to interested contractors for tendering process;
Maintenance, upgrade and management of existing facilities;
Installation of ATM machines
Project lifecycle understanding
Reading blueprints
My last working experience allowed me to work through all the Commonwealth of the Bahamas and to complete a number of prestigious and challenging utilities projects:
List of the major projects I have managed and completed over the years.
-2001-2002: Installation of 100,000 ft of water mains (and 300 service connections) in South Eleuthera (client: WSC-IADB), with also involvement in the construction of 3 pumping stations in Abaco (Marsh Harbour, Casuarina Point, Crossing Rock).
-2004: Abaco Club in Winding Bay, Abaco (installation of potable water, sewer collection, sewer stations, testing and commissioning); client: Peter De Savery developer.
-2005: new water mains along Harold Road (now T.W.Darling highway); client: WSC.
-2005/2006: Charlotteville subdivision; installation of potable water, sewer collection and pumping station, drainages.
-2006: High Points subdivision; installation of potable water, sewer collection and pumping station, sewer force main, drainages, power and telecommunications ducts and structures;
-2007: Emerald Coast subdivision: installation of potable water, sewer collection and pumping station, drainages, sewer force main;
-2008/2009: Nassau Airport redevelopment phase one: installation/expansion/repositioning of potable water and sewer system; client: NAD.
-2009: upgrade nd repairs of Shirley Street water and sewer systems; client: WSC.
-2010: Balmoral Subdivision: installation of potable water, sewer collection and pumping station, sewer force main, drainages.
-2011: Installation of new 24'' watermain along Prince Charles highway; client: WSC-JCCC.
-2011/2012: upgrade and repairs of Bay street and Down Town water and sewer systems; client: WSC.
-2012/2013: Albany development; installation of utilities along western side of the marina; client: Albany.
-2013: Windsor Business park : installation of potable water, sewer collection and pumping station.
-2014: Fair way subdivision, Coral Harbour: installation of potable water, sewer collection and pumping station.
-2015: upgrade and extension of hdpe fire main for BORCO oil storage facility, Freeport GranBahama.
-2016/2017: replacement of 70% of Lyford cay water mains with new HDPE pipes; 300 new service connections (with transition from old to new system without any service interruption); materials procurement and management for the new RO water plant ; client: New Providence Water Company.
- 2017: installation of 45,000 ft of new water mains and 200 service connection in San Salvador; client: WSC.
- 2018/2021: installation of 180,000 ft of new watermain, 500 service connections in Central Long Island, and upgrade works at Simms water plant; client: WSC-CDB
-2021: upgrade works at Marsh Harbour pumping station, Abaco; client: WSC.
-2022: Civil works at Blue Hill road power station for new back up batteries and electrical gears; client: Wartsilla-BPL.
-2022/2023: 12'' new chiller lines from Cove Hotel pump rooms to dolphins cay; client: Atlantis, Paradise Island
-2024-2025: installation of potable water, sewer collection and pumping stations, fire main, drainages, power and telecomm. ducts and structures; client: MORE DEV Co.
The scope of all projects included inspection, testing and commissioning.