Summary
Overview
Work history
Education
Skills
Timeline
Generic
Muhammad Saqab

Muhammad Saqab

SANNAZZARO DE' BURGONDI,Italy

Summary

Over 10 years of experience as a Quality Control, Assurance, Audit,
and planner of control activities. I have excellent interpersonal skills
empathy and problem solving. I speak English fluently and know Italian,
Hindi, Urdu, and Punjabi languages also very well.

Overview

13
13
years of professional experience

Work history

Quality Assurance

FINCIMEC S.P.A.
Project MEMC Electronic Materials SpA Novara
07.2024 - Current
  • Verification and validation: Scrutinized documentation for accuracy and completeness, ensuring adherence to industry standards and client requirements
  • Document control: Managed and verified Test Pack documents, Piping Isometrics, Welding Summary Lists, and various NDT reports (Radiographic, Ultrasonic, Dye Penetrant)
  • Quality assurance: Conducted thorough reviews to ensure correctness and consistency in documentation
  • Corrective action: Identified and addressed documentation discrepancies, ensuring timely resolution
  • As-built documentation: Verified and prepared final documentation for client submission
  • It has been successfully verified, and documentation packages have been submitted to clients
  • Implemented process improvements, reducing documentation errors.
  • Collaborated with cross-functional teams to resolve documentation issues.

Quality Dossier Responsible

Arkad SpA
Peakers Project Of Eni Power In Ravenna Italy
10.2023 - 06.2024
  • Prepare Mechanical completion, Ready for Start-up, and Test Pack dossiers.
  • Submission of final Dossiers to client.
  • Prepare mechanical, E&I ITR A&B, MCC, and RFSU Certificates.
  • Prepare the transmittal and send it to the client.
  • Provide status report of work to head office
  • Prepare the punch list
  • Used CCMS server of ENI Power for documentation
  • Verify all the documents of Test Pack, WSL, Calibration, Water analysis certificate, Pickling report of stainless steel, P&IDs, etc
  • Maintained accurate records of inspected items, providing valuable data for future process improvements
  • Verify the reports of Ultrasonic, pressure, prefabrication, painting, coating, and radiographic tests in the Test Pack dossier.

Quality Auditor

TECHIMP IMPIANTI S.p.a
Polyol Complex Project Tiszaújváros Hungary
09.2022 - 09.2023
  • Submission of all documents to client, Atex, Calibration,
    RFI, PID, Layout, Cable List, Hook up, Isometric drawing and
    instrument list etc.
  • Verify all the documents of the electrical and instrumental dossier before
    submitting to the client.

Quality Auditor

Techimp Impianti S.p.a
PDH Project Of Borealis In Kallo Belgium
04.2022 - 09.2022
  • Inspected work areas regularly for quality control procedures and
    worker actions in need of improvement
  • Participated in daily sub-contractor and client meetings and provided
    interpretation of data to investigators in the creation of Corrective and Preventive Actions.
  • Involved in the punch-listing of the completed construction activities
    (Punch-List–A&B) & ensure closing of the Punch items by the
    construction team before and after Mechanical Completion.
  • Issues the relevant Quality Records and, when necessary, write and
    sends to the QC Supervisor non-conformance reports.
  • Checks cable laying and cable identification & performs punch listing
    operations.
  • Updated as-built drawings, performs visual inspections, dimensional
    test, checks rating and material for connection.
  • Performed tests of continuity, Megger, and insulation resistance.
  • Checked installations and witnessed of the functional instrument,
    Ductor, and Torque tests.
  • Involved in Quality walk-throughs with the end user/customer &
    monitoring /recording the punch points to identify quality-related
    issues & implement best practices etc.
  • Collaborated with the construction team and supervisors to close the
    Punch points as prioritized by the client.
  • Performed pre-inspections and inspections with clients on-site.
  • Liaised with the Client's representative, Vendors, Project Site
    Engineers/Supervisors to coordinate quality issues including
    engineering queries, and the schedule of inspection/testing activities
    and ensure that communication exists and is maintained and
    assist when requested.
  • File all engineering drawings of project, and environmental reports
    into the plant's library.

Quality Inspector

Ansaldo Energia, Turbigo Power Plant
Ansaldo Energia, Turbigo Power Plant Italy
05.2020 - 03.2022
  • Participated in a team for Technical Performance Audits & ensured
    that an adequate QA/QC system was in place and confirmed effectiveness.
  • Executes the specific inspections on materials, equipment, and
    construction/installation activities on site.
  • Ensuring Various stages of Inspection (Materials/Installation/Final
    Inspection) activities & Rise UOSD report if any non-conformance
    identified as per Project Specification & Vendor drawing /
    Documents.
  • Ensure the correct implementation of the approved Inspection Test
    Plan and Installation of Instrument control & Electrical panels.
  • Ensure all the instruments are installed in suitable Zone
    classification as per Hazardous identification drawing.
  • Witness the tests, controls, and inspections carried out also Check
    conformity with the Quality Control Plan, obtain the relevant
    documentation, check procedures and equipment to be used in
    tests, controls, and inspections manage documents certifying tests,
    controls, and inspections.

Quality Inspector

TECHIMP IMPIANTI S.p.a
01.2019 - 04.2020
  • Performed frequent visual inspections to root out tolerance and compliance issues
  • File all engineering drawings of project, and environmental reports into the plant's library
  • Performs tests of continuity, insulation resistance
  • Check installation and Perform tests of functional instruments
  • Supported additional office functions relating to data entry and filing
  • Collect and file any inspection reports on received certificate of conformance, and inspection reports
  • Performed daily quality inspections for all electrical panels and instruments.

Quality Control Clerk

Alca, Sannazzaro De' Burgondi
Sannazzaro De' Burgondi, Lombardy, Italy
04.2015 - 12.2018
  • Utilized strong multitasking skills to manage multiple priorities and tasks, ensuring timely completion of each assignment
  • Maintained filing system and organized customer documents for easy retrieval of information
  • Maintained a strong attention to detail while working with high volumes of documents, ensuring accuracy and completeness in every task


Quality Inspector

GASCO Engineering Pvt Ltd
Karachi
01.2012 - 12.2015
  • Site inspection
  • Engineering drawings
  • Quality improvement
  • Client requirement
  • Request for inspection (RFI)
  • Visual inspection
  • Liaised effectively with the production team for seamless operations.
  • Initiated effective communication channels for seamless information flow between departments.

Education

Diploma - Electrical &Instrumental Engineering

Professional Skill Science Council

Bachelor of Arts - Humanities

University of The Punjab
2010

Skills

  • Excellent competence in the
    Microsoft Office package -
    Excel, PowerPoint, Word,
    and Windows XP, 7, Mac
    Internet Explorer Daily use
    of Mac
  • Attention to detail
  • Analytical and problem-solving
  • Effective communication
  • Time management and organization
  • Collaboration and teamwork
  • Adaptable with the ability to have valuable input to many aspects of a project
  • Ability to organize and motivate a team or work equally well within one
  • Competence in process analysis Knowledge of procedures and control techniques Knowledge of quality standards of the regulations in force
  • Great Ability to problem solve and communicate comfortably at all higher management levels
  • Reliable and well-organized with good experience and a common-sense approach
  • Good working knowledge of engineering drawings & specifications


Timeline

Quality Assurance

FINCIMEC S.P.A.
07.2024 - Current

Quality Dossier Responsible

Arkad SpA
10.2023 - 06.2024

Quality Auditor

TECHIMP IMPIANTI S.p.a
09.2022 - 09.2023

Quality Auditor

Techimp Impianti S.p.a
04.2022 - 09.2022

Quality Inspector

Ansaldo Energia, Turbigo Power Plant
05.2020 - 03.2022

Quality Inspector

TECHIMP IMPIANTI S.p.a
01.2019 - 04.2020

Quality Control Clerk

Alca, Sannazzaro De' Burgondi
04.2015 - 12.2018

Quality Inspector

GASCO Engineering Pvt Ltd
01.2012 - 12.2015

Diploma - Electrical &Instrumental Engineering

Professional Skill Science Council

Bachelor of Arts - Humanities

University of The Punjab
Muhammad Saqab