Summary
Overview
Work History
Education
Skills
Certification
Languages Known
Expectations
Timeline
Generic

Paresh Natwarlal Panchal

Kandivali (West)

Summary

Senior Piping Engineer with 28 years of experience at Tecnimont. Specialize in designing and implementing complex piping systems that meet industry standards and project requirements. Proven track record of managing large-scale projects for timely completion and cost-effective solutions. Known for delivering high-quality work and recognized as a reliable and skilled professional in piping engineering.

Overview

31
31
years of professional experience
1
1
Certification

Work History

Sr. Engineer - Piping. (Engineering Coordinator)

Tecnimont
2024.09 - Current
  • Working on SILLENO EPC (Karabatan, Kazakhstan) PE UNITS, LAO AND UI&O Plant Engineering Team
  • Working on Harvest Ammonia (Harvest Abu Dhabi) Ammonia Plant Engineering Team

Chief Design Engineer

Tecnimont Private
2015.09 - Current
  • Drove team productivity by prioritizing tasks effectively under tight deadlines and resource constraints.
  • Established cost-saving measures by identifying areas for improvement in the design process and implementing changes as needed.
  • Established efficient workflows within the design team through proactive communication and clear expectationssetting.
  • Solved challenging design problems by utilizing advanced simulation techniques and analytical tools.

Sr. Engineer - Piping. (Area Coordinator)

Tecnimont
2015.09 - 2024.09
  • Working on Harvest Ammonia (Harvest Abu Dhabi) Ammonia Plant Engineering Team
  • Working on GEMLIK GUBRE (Gemlik Gubre Turkey) UREA/Granulation Plant Engineering Team/Follow on Team
  • Worked on HMEL (HPCL Mittal Energy LTD / EIL) PP Plant Engineering Team
  • Worked on Spic (Southern Petrochemical industries Corp ltd) AMMONIA Plant Engineering Team
  • Worked on KIMA (Egyptian Chemical Industries Kima) UREA/Granulation Plant Engineering Team/Follow on Team

Principal Designer-Piping. (PDMS)

KBR
2010.09 - 2015.09
  • Worked on Nasr Full Field Development Project (ADMA) (OFFSHORE) Engineering Team
  • Worked on GORGON PROJECT BARROW ISLAND LNG PLANT (OFFSHORE) (CHEVRONE AUSTRALIA PTY LTD) Follow On Team
  • Worked on GORGON PROJECT BARROW ISLAND LNG PLANT (OFFSHORE)(CHEVRONE AUSTRALIA PTY LTD) Engineering Team

Sr. Designer-Piping. (PDS)

Petrofac
2008.01 - 2010.08
  • Worked on ELMERK Involved in Preparation of piping study Layouts, Checking of Isometrics and Piping G.A. Supports, Bill of Material, Modelling on PDMS Etc..
  • Worked on KASHGANE As built Resolving TQ From site.

Piping Designer (PDMS)

Ranhill Worley Parsons
2006.04 - 2007.02
  • Worked on SARAWAK SHELL BERHAD SABAH SHELL PETROLEUM CO. LTD (OFFSHORE) project (B11) Involved in Preparation of piping study Layouts, Checking of Isometrics and Piping G.A. Supports, Bill of Material, Modelling on PDMS Etc..

Sr. Piping Designer (PDS)

TECNIMONT ICB
2006.04 - 2007.02
  • Worked on TASNEE (HDPL) SAUDI ARABI Involved in Preparation of piping study Layouts, Checking of Isometrics and Piping G.A. Supports, Bill of Material, Modelling on PDS Etc..

Sr, Piping Designer (PDS/PDMS)

Petrofac
2003.09 - 2006.03
  • Worked on KASHGANE Involved in Proposal & engineering, Preparation of piping study Layouts, Checking of Isometrics and Piping G.A. Supports checking, Bill of Material, Modelling on PDS Etc..
  • Worked on HARWIL Involved in Preparation of piping study Layouts, checking of Isometrics and Piping G.A. Supports, Bill of Material, Modelling on PDMS Etc..
  • Worked on KOC (KUWAIT OIL COMPANY) Involved in Proposal, Preparation of piping study Layouts, checking of Isometrics and Piping G.A. Supports checking, Bill of Material, Modelling on PDS Etc..

Piping Designer (PDS)

TECNIMONT ICB
2002.10 - 2003.08
  • Worked on TASNEE (HDPL) SAUDI ARABI Involved in Preparation of piping study Layouts, Checking of Isometrics and Piping G.A. Supports, Bill of Material, Modelling on PDS Etc..

Piping Designer(PDMS)

Petrofac
2002.06 - 2002.09
  • Worked on DOROOD ONSHORE Project (PDMS) Piping study & Designee Layout Piping & Equipment Modeling on PDMS Design. Preparing Specification on Focus Piping & equipment layout on Draft Module. Isometric generation using iso_draft/Isorun

Piping Designer (PDS)

BECHTEL
2001.12 - 2002.05
  • Worked on BOROUGE AS-BUILT PETROCHEMICAL PROJECT (As Built project)
  • Worked on SPALDING POWER PROJECT Piping study & Designee Layout Piping & Equipment Modeling on PDMS Design. Preparing Specification on Focus Piping & equipment layout on Draft Module. Isometric generation using iso_draft/Isorun

Piping Designer (PDMS)

KAVERNER POWERGAS
2000.04 - 2001.11
  • Worked on BASF BDO UNIT (HYDROGENATION AREA)
  • Worked on THE DOW CHEMICAL COMPANY Piping study & Designee Layout Piping & Equipment Modelling on PDMS Design Module. Civil/Structures Modelling on PDMS. Design Module. Piping & equipment layout on Draft Module. Support Design on PDMS M.D.S. Module. Isometric generation using iso_draft/Isorun J.B.CLASH UTILITY

Piping Designer (AutoCAD)

KIRPALANEY & ASSOCIATES
1998.01 - 2000.03
  • Work involved preparation of piping & equipment layouts, Isometrics, Nozzle Orientation Drawings on CAD and have worked on following projects for various clients: NPK/DAP Plant of IFFCO,Kandla under Supervision of Hindustan Dorr-Oliver Ltd. Tankages of Artson Engg. Ltd., Power Plant of Nuclear Power Corporation of India.
  • Worked on Acad conversion of petrochemical drawings of RMPI, Muscat (Sultanate of Oman) and Bharat Petrochemical Corporation Limited, India.

Trainee Cad draughtsman (AutoCAD)

SUPREME ENGG. SERVICES
1994.07 - 1997.12
  • Worked on Cad & manual Drafting for piping layouts and isometrics of various clients such as Larsen & Toubro Ltd. And R J Associates Pvt. Ltd.
  • Also Deputed to R J & ASSOCIATES PVT. LTD Work involved preparation of Piping Layouts, Nozzle Orientations, Isometrics and Bulk MTO for Oxidation Plant of Sumitomo, Japan.

Education

Secondary School Certificate -

03.1994

Diploma - Mechanical Draftsman

Akar Technical Institute
08.1996

Skills

  • Leadership skills
  • Team management
  • Project management
  • Technical presentation
  • Technical expertise
  • Quality control
  • Schedule maintenance

Certification

  • Training in AUTOCAD from Akar Technical Institute
  • Certification course in Plant Design System (PDS) from Rolta Mumbai.
  • In house Training of Plant Design System (PDS) (BECHTEL)
  • In house Training of Plant Design Management System (PDMS)
  • In house Training of Smart Plant 3D (SP3D)

Languages Known

English, Hindi, Gujarati & Marathi.

Expectations

Responsibility, Authority and challenging working environment.

Timeline

Sr. Engineer - Piping. (Engineering Coordinator)

Tecnimont
2024.09 - Current

Chief Design Engineer

Tecnimont Private
2015.09 - Current

Sr. Engineer - Piping. (Area Coordinator)

Tecnimont
2015.09 - 2024.09

Principal Designer-Piping. (PDMS)

KBR
2010.09 - 2015.09

Sr. Designer-Piping. (PDS)

Petrofac
2008.01 - 2010.08

Piping Designer (PDMS)

Ranhill Worley Parsons
2006.04 - 2007.02

Sr. Piping Designer (PDS)

TECNIMONT ICB
2006.04 - 2007.02

Sr, Piping Designer (PDS/PDMS)

Petrofac
2003.09 - 2006.03

Piping Designer (PDS)

TECNIMONT ICB
2002.10 - 2003.08

Piping Designer(PDMS)

Petrofac
2002.06 - 2002.09

Piping Designer (PDS)

BECHTEL
2001.12 - 2002.05

Piping Designer (PDMS)

KAVERNER POWERGAS
2000.04 - 2001.11

Piping Designer (AutoCAD)

KIRPALANEY & ASSOCIATES
1998.01 - 2000.03

Trainee Cad draughtsman (AutoCAD)

SUPREME ENGG. SERVICES
1994.07 - 1997.12

Diploma - Mechanical Draftsman

Akar Technical Institute

Secondary School Certificate -

Paresh Natwarlal Panchal