Master on ship of more 3000 gross tonnage
Senior DPO since 15/05/2009
DPO Nautical Institute Unlimited Certificate nr. 9451
25604 DP desk hours on:
More than 20 years experienced on:
Pipelay and Cablelay Vessels Dp2 / Dp3 Class
Trenching vessel Dp2 / Dp3 Class
Construction Vessel – Topside and Subsea Installation
Heavy Lift on DP and Mooring System
Wind Farm Installation and Development Field
Diving & ROV Ops.
Crew Management
ISM/ISPS/MLC/OVID/OCIMF Auditor Expert
DP Advisor
YUNLIN OWF (SKYBORN-TOTAL ENERGIES) – TAIWAN (WIND FARM INSTALLATION / HEAVY LIFT)
July/September 2022 – April/September 2023 – March/May 2024 Installation of 80 monopiles in Yunlin OWF West coast of Taiwan
Weight between 1200 and 1800 MT
Water depth between 10 to 35 mtrs
ARAMCO ZULF380/350 – SAUDI ARABIA / ZULUF FIELD (HEAVY LIFT)
February 2022 – Demolition / Installation Topside of 825/820 MT
Water Depth 34 mtrs
ARAMCO ZULF246 – SAUDI ARABIA / ZULUF FIELD (HEAVY LIFT)
April 2022 – Installation Topside of 1020 MT
Water Depth 34 mtrs
ARAMCO SFNY1150/1500 – SAUDI ARABIA / SAFANIYA FIELD (HEAVY LIFT – FLEXILAY)
March/April 2022 – Demolition / Installation Topside of 1158/1172 MT
Flexi Lay – 6,708 km
Water Depth 34 mtrs
ARAMCO BRRI TP-1 40/45 – SAUDI ARABIA / BERRI FIELD (HEAVY LIFT)
April 2022 – Demolition / Installation Topside of 450 MT
Water Depth 34 mtrs
ARAMCO JOP SPM 34 – SAUDI ARABIA / JUAYMAH (SAT DIVING)
November 2022 / January 2023 - Hot Tapping 42” – 48” for JOP Platform Bypass system
SHELL – QATAR (LIFT)
September 2018 / January 2019 – Power Stand (15 MT) and Coiled tubing reel (65 MT) emplacement at Al Khor Rig Platform – Ras Laffan (Qatar)
SUMUD EPCI TOTAL – QATAR (PIPELAY S-LAY)
April / June 2021 – 16” pipeline of approximately 9.6 km from DP4 to DP3 Platform in Al Khalij Field (Qatar)
16” pipeline of approximately 5.8 km from DP3 to DP2 Platform in Al Khalij Field (Qatar)
BAYAN GAS REDEVELOPMEN PHASE 2 (PIPELAY S-LAY)
October 2021 – 20” pipeline of approximately 12.7 km in Bayan Field (Malaysia)
NAM CON SON 2 –VIETNAM (PIPELAY S-LAY)
March/April 2015 – 26” gas pipeline of approximately 134 km in the Nam Con Son Basin – Vietnam
Connection from Hai Thach, Moc Tinh, Thien Ung and other gas field located in South West Vietnam
Water depth between 40 and 75 meters
WHP-H5 TGT – VIETNAM (PIPELAY S-LAY)
June/August 2015 – 6” gas pipeline of approximately 5.5 km in the TGT Field – Vietnam
8” water injection pipeline including tie-spool of approximately 7 km in the TGT Field – Vietnam
12” production pipeline of approximately 12.5 km in the TGT Field – Vietnam
Water depth between 40 and 75 meters
CPOC – THAILAND/MALAYSIA (PIPELAY S-LAY / HEAVY LIFT)
August/October 2015 – 4 x 18” gas pipelines of approximately total 43.2 km in the MUDA Field – Thailand.
Water depth between 40 and 75 meters
2 x 670 MT Jacket installation + Pile installation in the MUDA Field – Thailand
4 x 950 MT Topside installation in the MUDA Field – Thailand
TJT –MALAYSIA (HEAVY LIFT)
1 x 670 MT Jacket installation + Pile installation in the TJT Field – Malaysia
HESS –MALAYSIA (HEAVY LIFT)
3 x 830 MT Top-side installation in the New HESS Development Field – Malaysia
MOC MURPHY OIL –MALAYSIA (HEAVY LIFT)
1 x 1200 MT Top-side installation + Spools installation in the New MOC Development Field – Malaysia
MUMBAI HIGH SOUTH REDEVELOPMENT PHASE III – INDIA (RIGID / FLEXI PIPELAY)
October 2016 / January -2017 – 15 segments of approximately 115.9 km pipeline for well fluid, sand gas, lift gas and crude oil
Water depth between 70 and 80 meters
Installation of 7.5 km of flexi Power Cable (1.5 MW)
B127- INDIA (PIPELAY S-LAY) / ONGC
February 2017 / May -2017 – 11 segments of approximately 128.9 km pipeline for well fluid, sand gas, lift gas and crude oil
Water depth between 25 and 50 meters
TANAP TRANS ANATOLIA NATURAL GAS PIPELINE – TURKEY (PIPELAY S-LAY)
September 2017 / November 2017 – 2 x 36” Pipeline / 17.6 km
Water depth between 20 and 55 meters
MELLITAH – LIBYA (LIFT) / ENI
April 2018 – Liebher Crane Boom lifting removal from DP4 Platform in Bouri Field (Libya)
CECON L5-A (PIPELAY S-LAY)
10-inch gas pipeline and 2-inch MEG pipeline with an approximately route of 10,600 meter, in Block 5 (North Sea) between platform L5-A and L5-D, complete with all tie-ins, pre-commissioning and crossing operations.
Water depth 40 meters
Cable and pipelaying (S-Lay / J-Lay / Flexi)
Pipelay on anchors
Heavy lift installations up to 3100 MT
Windfarm monopiles installation up to 1800 MT
Decommissioning / Demolitions Operations
Diving Operations (Air dive / Sat dive)
ROV Operations
Trenching Operations
Survey Operations
PSSR
MEDICARE
PST
PST Refresher
PSCRB (Survival)
PSCRB (Survival) Refresher
BASIC FIRE FIGHTING
BASIC TRAINING REFRESHER
ADVANCED FIRE FIGHTING
ADVANCED FIREFIGHTING REFRESH
ROC (Radar Observer’s Course)
A.R.P.A.
A.R.P.A. / S.A.R. BRIDGE MANAGEMENT
GMDSS
BRIDGE RESOURCE MANAGEMENT / LEADERSHIP AND TEAMWORK
BRIDGE RESOURCE MANAGEMENT / USE OF LEADERSHIP AND MANAGERIAL SKILLS
ECDIS TRANSAS
DP BASIC OPERATOR
DP ADVANCED OPERATOR
UNLIMITED DPO CERTIFICATE – SENIOR DPO
FURTHER OFFSHORE EMERGENCY TRAINING (FOET)
CAA OFFSHORE OPERATOR’S HELIDECK VHF RADIO COURSE
SSO - Ship Security Officer
COMPANY SECURITY OFFICER / CSO
CYBER SECURITY AWARENESS
MARITIME ENGLISH COURSE
MARLIN’S ENGLISH TEST 92%
GAS MONITOR – OPITO APPROVED
OPITO IMIST – International Minimum Industry Safety Training
ISM/ISPS/MLC Lead Auditor – COC
ARAMCO Approval FAL
BASIC H2S - OPITO
ADNOC HSE
Passport YB7677709
Seaman Book National nr. 2289
COC Master on Ship more than 3000 GT nr. PO-13/2024
UAE Resident 784198083498992
Medical Examination / Visit 2 Years Exp.. 2025