Accomplished Technical Leader with extensive experience at Tüpraş Kırıkkale Refinery, specializing in refinery plant operations and energy efficiency processes. Demonstrated expertise in Aspen HYSYS and other engineering tools, alongside process safety. Proven track record in leading high-value projects and mentoring teams for enhanced productivity.
2024 New SRU Project
Process leader.
2023 Water Treatment Plant
Progressing process design of reverse of osmose unit which has 250 m3/h water production.
2023 50 tons/h 40 bar Boiler Installation
Process studies and commissioning leader.
2022 Crude Oil Unit Waste Heat Study
Owner of exchanger designs. Line sizing and facility siting responsibility.
2022 15 ton/h Reverse Osmosis Project
Design of project and process. Responsibility for project specifications and tender.
2022 Waste Water Treatment Deodorizing Unit Design
Responsibility of odor prevention system BEDP preparation.
2021 Solar Power Plant
2 MWe and 5 MWe solar plants project leader, call letter and legal applications responsibility.
Tüpraş Sustainability Projects were started with this project.
2020 Revision of Furnace Logics
Revision of F-101 furnace logics according to the process - process manager
2020 LSRN-HSRN Wagon Bottom Loading Project
LSRN and HSRN wagon bottom loading project process design. Commissioning of the first LSRN bottom loading project in Turkey.
2019 Crude Oil Unit Heat Integration Study
Process studies leader. 1,3 Gcal/h energy saving.
2018 Crude Oil Units Column Revamp Study
Energy leader of column internals replacement.
2017 Dirty Water Stripping Unit Project
Responsibility of BEDP preparation.
2017 15.4 MW 119 t/h Capacity Process Furnace Commissioning
Process studies leader. Responsibility of engineering and commissioning studies in the furnace renovation process.
2017 F-1201 Furnace Revamp
Process studies leader.
2016 Cold BFW Project
2014 Refinery Electricity Consumption Optimization
Leader of electric motors and VSD efficiency studies.
2013 2 MW Back Pressure Turbine Project
Development of turbine project and design of refinery steam balance.
2012 30 tons/h 10 bar Boiler Installation
Modelling steam distribution of refinery. Specifying boiler's capacity.