Skilled individual focused on obtaining experience in professional field. Ready to analyse data and evaluate growth for company. Flexible, reliable and excellent in multi-tasking.
Thesis Title: “Risk management assessment in production systems based on Fuzzy logic”.
Supervisor: Sylwia Werbińska-Wojciechowska
Institution- Wroclaw University of Science and Technology, Poland.
Thesis Title:“Integration of Building Information Modelling (BIM) and LEED for Performance Analysis of a Residential Building in Khulna, Bangladesh”
Supervisor: Mizanoor Rahman
Institution- Khulna University of Science and Technology, Khulna, Bangladesh.
-Completed design of a 3 storied reinforced concrete building with AutoCAD and analyzed its response spectra through seismic calculations in EXCEL.
-Used different structural health monitoring tools like rebound hammer, ultrasonic pulse velocity machine and rebar scanner.
-Introduced with OSHA regulations for the safety of a building
-Completed structural design of a 10 storied residential building by both manual techniques and software techniques using ETABS.
-Implemented BIM tools such as REVIT, ROBOT, Autodesk Navisworks, Autodesk Design Review in an overall building project life cycle.
-Estimated a whole residential building project by manual techniques and RSEPS software.
-A Study to implement project management techniques like conceptual estimating, procurement challenges, construction schedule and delay analysis, budget tracking etc.
-Used MS Project software in different stages of a project like scheduling.